Address
051-6122937, 0311-5193625, 0092-335-4176949, Office # 27, Second Floor, Maryam Shadi Hall Plaza (Airies Plaza), Shamsabad, Murree Road, Rawalpindi, Pakistan 46000 View mapQuality control measures taken in preparation for the implementation phase of the project, it can lay
a good foundation for the later quality control. The project works under its own characteristics,
adopted a series of targeted measures, and achieved good results.
Material, drawings, measurement equipment and instrumentation, technical measures, and other
special types of certificates to ensure the construction quality of a variety of factors, require the
construction unit must be clear and full-time staff dedicated department to manage. For cultural
power transmission project construction contractor established by the quality assurance system is
perfect, sound, etc., by the project supervision department is responsible for auditing the same time,
supervision also is running in the daily management of its normal supervision. The implementation
is not in place, make the appropriate assessment.
Design drawings prior to construction, in accordance with the provisions of the construction unit
and project supervision through the Ministry of Audit, in order to carry out the construction joint
hearing without objection. Strict implementation of the project tests, system tests, organized by the
owners or supervision unit, the unit design and overall responsibility for the professional designer to
the building, construction, supervision and other units designed disclosure. Content tests, including
general project overview, schedule requirements, conditions and requirements for the construction
are key parts of the precautions. Design unit tests, during the meeting about the unit raised the
problems in drawing, design units are introduced to explain, clear solutions, has doubts about the
place to discuss, design disclosure to ensure that the parties after the construction personnel,
supervision and construction unit of design and construction requirements intent can understand and
master.
The educational system emphasis mind-streching approch that increase information seeking aptitude and emphasises abilities to boost young confidence in dealing with the turmoil of the global corporate world. The institute’s primary goal is to give high-quality management, technical, Safety & IT Physical / Online courses.For certification, this institute is affiliated with the Govt of Pakistan, PSDA also international certfication awarding body to UK, USA, Canada, ISO. We analyse and recognize talent at all levels by providing a variety of certifications, professional registrations, content and skill framework, and other resources.
QA/QC Electrical Course Outline:
The Basic Required documents for the QA/QC Personal Method of Statement.
Basic installation procedure of Electrical Equipment .Plans review, Quality Control Requirements.
Installation method for LV Cable, MV Cable, HV cable, underground cable, above ground cable, cable tray,
Conduit, Trunking.
Testing of Cable (Continuity test, IR test).
Installation Method of Transformer.
Testing of motor (IR test, WR test, Die Electric Test, Solo Run Test), MCC.
Document Preparation, ITP, RFI, NCR, Preventive and Corrective action, Check list.
IEC IP code for indoor and outdoor light fixture.